line
Flags Go to LeanPlus USA page Go to LeanPlus Russia page Go to LeanPlus India page Go to LeanPlus Malaysia page

vertical line

LeanPlus, India logo

India flag

SATISFIED CUSTOMERS INCLUDE:

India Logos graphic

  • Madras Management Association
  • Coimbatore Management Association
  • Larsen & Toubro Kansbahal Works
  • Larsen & Toubro Demag
  • Larsen & Toubro Business Unit
  • Lakshmi Machine Works
  • Baliga Lighting
  • Talema Electronics
  • Royal Enfield Motorcycles
  • GlaxoSmithKline
  • Areva T&D
  • Best Pumps Engineering

 

Click HERE to request more information.

 

dashed line

 

CASE STUDY:
HEAVY EQUIPMENT MANUFACTURER , INDIA

June, 2005 – December, 2006:
LEAN Manufacturing Training/Mentoring

LeanPlus™ provided:

  • 2-Day Executive LEAN Training
  • 6-month Certified LEAN Expert Training
  • 3 Rapid Improvement Process (RIP)

A heavy equipment machine manufacturing division that makes small quantity of large machines for global market sales needed to REDUCE CYCLE TIME to meet customer demand. LeanPlus™ facilitated a 5-day RIP event that provided a new layout and removed hidden waste.

 

THE RESULTS ...
  • Process cycle time reduced from 41 days to 29 days (29% reduction)
  • 1st year savings of Rs 22 Lakhs and increased sales potential of Rs 2.56 Cs in 5 days

 

CASE STUDY:
PHARMACEUTICAL MANUFACTURER , INDIA and SRI LANKA

August, 2001 – July, 2002:
LEAN Sigma Training/Mentoring

LeanPlus™ provided:

  • 6-month Lean Expert Training Course
  • 6 months of Mentoring/Coaching

A pharmaceutical manufacturing company used Lean Manufacturing Practices and Six Sigma techniques to:

  • Reduce scrap/waste from 6% to 1.5%
  • Savings was equal to 5.7% of their annual sales after just 9 months
  • More than 14 "just-do-it" projects identified and implemented by shop floor personnel

 

September, 2001 – June, 2002
LEAN Sigma Mentor/Coach

A nutritional food supplement manufacturing company used Lean Manufacturing Practices and Six Sigma techniques to change their layout and improved processes.

 

THE RESULTS ...
  • 5.7% production increase
  • Savings was equal to 6.1% of their annual sales after just 9 months

 

dashed line

LeanPlus™, India
PH: 09444007105

dashed line

CONTACT US FORM
(*) denotes required information)

Please complete the CONTACT form below to submit comments and questions. Your inquiry will be answered within 2 business days.

Name*:
E-mail*:
Phone:
Ext.:
 
Comments or Questions:
   

 

 

   

line

»Return to top

 

 
Go to LeanPlus USA page Go to LeanPlus Russia page Go to LeanPlus India page Go to LeanPlus Malaysia page